Home / News / 2021 Project Review
NEWS / 2022.01

2021 Project Review

■2022.01 · ARTICLE

1. Adidas custom logistics warehouse, Suzhou — flatness FF≥60, FL≥45 — integrated flooring 55,000 m².

2. Prologis Xinhang logistics warehouse, Hangzhou: integrated flooring 120,000 m², including 9,000 m² cold storage.

3. XIMACH Yangtze Delta fashion supply chain hub, Changshu: integrated flooring 220,000 m².

4. Prologis Kangbo logistics park, Changshu: integrated flooring 120,000 m².

5. MissFresh logistics warehouse, Changshu: integrated flooring 60,000 m².

6. HAWE Hydraulik (Germany), Wuxi: concrete pouring + laser screeding + power troweling + 2 mm epoxy-PU ultra-wear-resistant floor, 22,000 m².

7. Spotlight Automotive (Sino-German joint venture), Zhangjiagang: integrated flooring 90,000 m².

8. SEW-Eurodrive (Germany), Suzhou: KORODUR thick-layer wear-resistant floor 18,000 m².

9. Florence Town outlets (Italy), Shanghai: PU silent anti-slip floor 45,000 m².

10. Datong Gear, Kunshan: integrated flooring + 2 mm epoxy-PU ultra-wear-resistant floor 20,000 m².

11. Zhangjiang Science Convention Center, Shanghai: 28,000 m²; water-based epoxy mortar + PU wear-resistant top coat, Class A fire rating.

12. Autokabel (Germany), Taicang: integrated flooring + sealed densification 20,000 m².

13. Zhengzhou Yutong Bus: integrated flooring + sealed densification 45,000 m².

▣PROJECT PHOTOS
← Back to News 2022 Project Review → ← 2020 Project Review